Insulating (13 июл 2018 г. – 1 янв 0 г.)

Описание:

During this phase gravel will be put over the insulation as root stops and drainage systems. Moisture blankets will be added afterwards, and small stones will be on top to hold it in place.

Добавлено на ленту времени:

5 июн 2018
0
0
300
YMA A,M,M,M
Green roof

Дата:

13 июл 2018 г.
1 янв 0 г.
~ 1 weeks