// todo need optimize like in event.jsp. Add indexing or not indexing this page. Insulating (jul 13, 2018 – jan 1, 0) (Timeline)
30
/
AIzaSyAYiBZKx7MnpbEhh9jyipgxe19OcubqV5w
April 1, 2024
338791
99044
2

Insulating (jul 13, 2018 – jan 1, 0)

Description:

During this phase gravel will be put over the insulation as root stops and drainage systems. Moisture blankets will be added afterwards, and small stones will be on top to hold it in place.

Added to timeline:

5 Jun 2018

Date:

jul 13, 2018
jan 1, 0
~ 1 weeks