Insulating (13 Jul 2018 Jahr – 1 Jan 0 Jahr)
Beschreibung:
During this phase gravel will be put over the insulation as root stops and drainage systems. Moisture blankets will be added afterwards, and small stones will be on top to hold it in place.
Zugefügt zum Band der Zeit:
Datum:
13 Jul 2018 Jahr
1 Jan 0 Jahr
~ 1 weeks