30
/
AIzaSyAYiBZKx7MnpbEhh9jyipgxe19OcubqV5w
April 1, 2024
Public Timelines
FAQ
Menu
Public Timelines
FAQ
Public Timelines
FAQ
For education
For educational institutions
For teachers
For students
Open cabinet
For educational institutions
For teachers
For students
Open cabinet
Create
Close
Create a timeline
Public timelines
Library
FAQ
Download
Export
Duplicate
Premium
Embed
S06 ORT History
Edit
Updated 1 Dec 2017
0
0
303
Share
Contributors
Created by
Valen Hung
List of Edits
Attachments
Comments
Taoyuan Toastmaster Group
By
Valen Hung
8 Nov 2017
0
0
382
Events
TAO Chamber Temperature runaway 4h15m
Provide All S/N of Tin Can/Tin Cards and OBOs.
1) Quote was provided by GF for long term protection plan. 2) OBO loopback was swapped for T0 OBO-0 verification under room temp. testing.
6 TiN Card GNET failed on the same period on 21:30 and 22:30, It is new finding we’ve never ever seen it before.
Periods
1st Run ORT with room temp. and all results positive
2nd & 3rd Run ORT for QSFP PRBS verification. Temp. is not a troubling fact.
4th Run ORT with Thermal + Power cycling profile. OBO and DDR and QSFP are major issue.
Short term protection trail run are good for solution implementation at TAO and iPT both.
5th and 6th Run ORT for T0 OBO-0 hard module verification. Issue cannot duplicated.
About & Feedback
Terms
Privacy
Library
2024
©
Time.Graphics
Support 24/7
Cabinet
Get premium
Donate
The service accepts bank transfer (ACH, Wire) or cards (Visa, MasterCard, etc). Processed by Stripe.
Secured with SSL
Excellent (Trustpilot Reviews)
Based on 115+ reviews
Write your own review on
Trustpilot.com
Comments