33
/
AIzaSyB4mHJ5NPEv-XzF7P6NDYXjlkCWaeKw5bc
November 30, 2025
92516
31647
2
Public Timelines
FAQ

2nd & 3rd Run ORT for QSFP PRBS verification. Temp. is not a troubling fact. (10h 53min, nov 23, 2017 y – 20h 7min, nov 24, 2017 y)

Description:

Create a thermal profile for QSFP PRBS verification and based on the result matrix, Temperature change is not a troubling fact for QSFP issue.
Also we run ORT with room temp for double verification as well.

Added to timeline:

1 Dec 2017
0
0
421

Date:

10h 53min, nov 23, 2017 y
20h 7min, nov 24, 2017 y
~ 34 hours