U1 MI (21-28 Sept 2018)
Created by
Dhiafullah Ezani
⟶ Updated 30 Sep 2018 ⟶
List of edits
Timelines by
Dhiafullah Ezani
:
30 Sep 2018
0
0
370
Unit Tx 3
30 Sep 2018
0
0
345
Station Transformer
30 Sep 2018
0
0
332
Station Transformer 2
Comments
Periods
Guide Vane Manual Wet Stroking
IPB offline PD test & EMI scanning
Gen offline PD & Tan delta test
Technical data spec for spare part (Excitation Panel & Generator Inergen Control Panel)
Unit tx electrical test
Excitation tx electrical test
2M & 6M Maintenance (Generator brushgear)
Protection relay calibration
Commissioning Aux test run & Alarm Trip Test
Guide Vane Manual Dry Stroking
Gen tx Air Bag replacement
Commissioning Generator Test Run & Handover to NLDC
Gen tx electrical test & Tx guard test. (GAMP)
Commissioning Generator Test Run & Handover to NLDC
Guide Vane Manual Wet Stroking
2M & 6M Maintenance (Generator brushgear)
Gen tx Air Bag replacement
IPB offline PD test & EMI Scanning
Technical data spec for spare part (Excitation Panel & Generator Inergen Control Panel)
Gen offline PD & Tan delta test
Unit tx electrical test
Excitation tx electrical test
Gen tx electrical test & Tx guard test. (GAMP)
Protection relay calibration
Guide Vane Manual Dry Stroking
Commissioning Aux test run & Alarm Trip Test
Guide Vane Manual Wet Stroking