6h 41min, jan 25, 2017 y - Spool 3468688-0038 was re-inspected in pre-shipment activities on 01/25/2017. CoF Test passed. Green dot was placed. Visually inspected, but detected hit wire in external surface. Sent to RWD to remove damaged wire. 255 lbs before sending.