33
/
AIzaSyB4mHJ5NPEv-XzF7P6NDYXjlkCWaeKw5bc
November 30, 2025
2258546
189525
2
Public Timelines
FAQ

feb 14, 1959 - Complete technical review of the reactor and its proposed operation was made

Description:

A complete technical review of the reactor and its proposed operation was made in February 1959, when Combustion Engineering, Inc.
became the Contractor, by a Nuclear Safety Committee composed of personnel from the Connecticut offices of Combustion Engineering. It appears that no other such review or appraisal of the safety of reactor operation has been made since that time by the Combustion Engineering, Inc. Reactor operating procedures, completely satisfactory to the AEC, have never been completed by
Combustion Engineering, Inc., although they have been in the process of preparation and revision since mid-1959.

Added to timeline:

Date:

feb 14, 1959
Now
~ 66 years ago