feb 13, 1958 - Design and Proposed Operation of the Reactor were Reviewed
Description:
 Design and Proposed Operation of the Reactor were Reviewed by the Hazards Evaluation Branch of the AEC's Division of Licensing and Regulation and also by the Advisory Comittee on Reactor Safegaurds. Approval was given by both of these groups for operation of the plant, as designed, at power levels up to 3 MWt. The ABC staff report stated "when higher power-level operation is contemplated, a report of additional hazards and consequences of operation at this new power level should be
submitted together with a report of the operating experience at the 3 MW level." 