Cost Analysis (dec 1, 2018 – dec 5, 2018)

Description:

-Checking the types of material available
-Selecting the most effective and economical material for the turbine.
-Checking on cost of other accessories required to install the turbine.
-Checking on the installation cost.
Finding means to reduce on the overall cost of the project.

Added to timeline:

Date:

dec 1, 2018
dec 5, 2018
~ 4 days