// todo need optimize like in event.jsp. Add indexing or not indexing this page. IR18429 Drop II SIT Execution (aug 27, 2018 – sep 25, 2018) (Timeline)
30
/
AIzaSyAYiBZKx7MnpbEhh9jyipgxe19OcubqV5w
April 1, 2024
408764
112862
1

IR18429 Drop II SIT Execution (aug 27, 2018 – sep 25, 2018)

Description:

Execution includes test of
1) Call Conductor (Trigger Point)
2) API (Connectivity)
3) MICA/RCRM/Assist Edge Robots (Flow to IT)
4) MAXIM/RCRM/MICA/AXIS/FLEXCAB - (Changes in IT systems)
5) UNICOM,ISLFUL,OMFUL,AM-SHARED,BAM,BROADWORKS, NPAMS,IPAMS,CDBOR etc [Used to test order flow to downstreams]

Added to timeline:

Date:

aug 27, 2018
sep 25, 2018
~ 29 days