Fairmont Dam - pump and turbine switch (oct 3, 1819 – nov 27, 1822)

Description:

The Fairmount Water Works was initially constructed between 1812 and 1815 on the east bank of the Schuylkill River. The Water Works initially consisted of a 3 million US gallons (11,000,000 l) earthen reservoir atop Faire Mount (now site of the Philadelphia Museum of Art), and a pump house with two steam engines to pump water. Between 1819 and 1821, a 1,600-foot-long (490 m) dam was built across the Schuylkill to direct water to a Mill House with three water wheels that replaced the steam engines in 1822. Later, Jonval turbines were used to lift the water in a New Mill House and in the renovated Old Mill House.[3]

Added to timeline:

7 Aug 2018
0
0
916

Date:

oct 3, 1819
nov 27, 1822
~ 3 years