33
/
AIzaSyB4mHJ5NPEv-XzF7P6NDYXjlkCWaeKw5bc
November 30, 2025
1158165
348309
2
Public Timelines
FAQ

Dentsu Router 1.4 Go-live with Backward Compatibility (copy) (14h 30min, feb 24, 2020 y – 15h 30min, feb 24, 2020 y)

Description:

On Monday Feb 24th at 11h00 CET, the Router will accept the transmission of 1.4 messages.
The routing defined in the 1.2 specification is maintained. The routing rules will not be updated at this stage.
At this point ID Issuers and Distribution systems should rollout the updates.
During this roll out period, the Router and Primary repositories support both messages of versions 1.2 and 1.4.

ID Issuer can start the update of the EU wide registry.

Added to timeline:

Date:

14h 30min, feb 24, 2020 y
15h 30min, feb 24, 2020 y
~ 60 min