737 MAX Development (aug 15, 2011 – jan 29, 2016)
Description:
The MAX development hit several speed bumps along the way, leading to the software system MCAS that would later play a leading role in bringing down the planes.
Added to timeline:
CAPSTONE: The 737 MAX
The events leading to the 737 MAX catastrophes.
Date: