41
/
AIzaSyB4mHJ5NPEv-XzF7P6NDYXjlkCWaeKw5bc
May 31, 2026
103072
34855
2
Public Timelines
FAQ

Kerr-McGee (jan 1, 0 – 10h 4min, oct 1, 1934 y)

Description:

From 1936 to 1980, Kerr-McGee operated a wood-treating plant in Navassa. The plant generated wastewater that was disposed of in ponds on site. Wastewater also discharged into marshes on the south end of the site.

Added to timeline:

ByTia
7 Dec 2017
2
0
1154

Date:

jan 1, 0
10h 4min, oct 1, 1934 y
~ 1936 years

Images: