33
/
AIzaSyB4mHJ5NPEv-XzF7P6NDYXjlkCWaeKw5bc
November 1, 2025
Create a timeline
Public Timelines
For education
For educational institutions
For teachers
For students
Cabinet
For educational institutions
For teachers
For students
Open cabinet
FAQ
Get premium
Close
Create a timeline
Public timelines
FAQ
About & Feedback
Terms
Privacy
FAQ
Support 24/7
Cabinet
Get premium
Donate
Edit
Download
Export
Duplicate
Premium
Embed
Share
Digital Media
Category:
Other
Updated:
26 Sep 2017
0
0
803
Contributors
Created by
Julia
Attachments
Comments
Events
Have third group meeting done(10/1, 11.59pm) 1. After the meeting, leader report the project progress to Yulin. 2. Turn in the 10 Bibliography sources. 3. Turn in the outline/framework of the paper.
Have second group meeting(9/26, 11.59pm) 1. After the meeting, leader report the project progress to Yulin. 2. report who is assigned for each role?
Paper draft complete(10/6, 11.59pm) 1. All teams have to upload the draft paper and Slides to Google Drive.
Turn in your Final Paper and Slides through Canvas(10/10, 11.59pm)
Have presentation rehearsal (10/10-10/11, 11.59) !!!make sure your presentation is within 6 mins
Final Presentation (10/12, 9.30am) 1. make sure first team be in class at 9.15 to set up. 2. Every team has 1 copy of slides and 35 copies of executive summaries.
Yulin have the feedback on the draft Paper& Slides, all feedback back to teams by(10/8, 11.59)
Yulin has the weekly check from teams(9/26)
Yulin has the weekly check from teams(10/1)
Yulin has the weekly check from teams(10/6)
Yulin has the weekly check from teams(10/11)
About & Feedback
Terms
Privacy
FAQ
Support 24/7
Cabinet
Get premium
Donate
The service accepts bank transfer (ACH, Wire) or cards (Visa, MasterCard, etc). Processed by Stripe.
Secured with SSL
Comments