TL QAD
Category:
Other
Updated:
1 Feb 2021
0
0
247
Contributors
Created by
bodithat
Attachments
Comments
OJT Plan Rev.1
By
bodithat
23 Feb 2021
0
0
188
Events
All Early QADS HW at Metlink
MEA network ready
Surveying stop due to covid restrictions
Surveying resume by MEA technician
ICCP Test with EGAT was postponed. EGAT ICCP was not ready.
Tentative Final report Submission, Feb 19, 2021
Request to issue letters for grant permission to work in Thailand and issue NON-B VISA for OSI team
Letters received from MEA regarding Work permit and VISA
Work permit granted from Ministry of Labour
Tentative arrival of OSI team Need 14days of quarantine
Tentative start working date of OSI team in Thailand March 5,2021
Periods
SW Intstallation
Installation at CLD and DDE
Network Setup
Data Engineering Workshop FRTU testing (2 types)
HW setup at Metlink Office
Sub stations surveying
14 types of SRTU testing with QADS (Finished Jan 29,2021)
Tentative ICCP testing with EGAT system
Tentative FRTU testing with QADS (The rest 5 types)
Final report preparation
About & Feedback
Terms
Privacy
Library
FAQ
Support 24/7
Cabinet
Get premium
Donate
The service accepts bank transfer (ACH, Wire) or cards (Visa, MasterCard, etc). Processed by Stripe.
Secured with SSL
Comments