41
/
AIzaSyB4mHJ5NPEv-XzF7P6NDYXjlkCWaeKw5bc
May 31, 2026
Create a timeline
Public Timelines
For organizations
For companies
For educational institutions
For teachers
For students
Dashboard
For educational institutions
For teachers
For students
Dashboard
FAQ
Close
Create a timeline
Public timelines
FAQ
About & Feedback
Terms
Privacy
FAQ
Support 24/7
Dashboard
Get premium
Donate
Edit
Download
Export
Duplicate
Premium
Embed
Share
MEE 494
Category:
Other
Updated:
18 Apr 2021
0
0
282
Contributors
Created by
Noah Swartz
Attachments
Comments
Test Timeline MEE 489
By
Noah Swartz
6 Mar 2021
0
0
225
Events
Prototype Requirements and Prototype Plan
Eng. Analyses and Long Lead Hardware, Manufacturing Methods
Manufacturing and Test Plans
Test Procedures, Starting Manufacturing, DR4
Starting the Engineering Prototype Build Book
Incoming Inspection and Manufacturing Issues
Deviations and Mid-Course Changes
Assembly, First Article Inspection and DR5 Presentation
Final Report Sections
Testing Issues, Repair or Rework
Test Analyses/Reporting/Update Prototype Dwgs
Prepare for DR6
Final Report Editing
Presentation Prep
Final Report Due & End of Course Deliverables
FINAL PRESENTATION
LL Hardware
Order Parts
Prototype Prelim DR4
Prototype must be completed by 3/10
Testing Readiness Review DR5
Test Results - DR6
Final Reports Due
Final Presentations
Prod Dwg Pkg Due
Periods
Prototype Design/Dwgs
Prototype Manufacturing
Prototype Testing
Report/Checklists
About & Feedback
Terms
Privacy
FAQ
Support 24/7
Dashboard
Get premium
Donate
The service accepts bank transfer (ACH, Wire) or cards (Visa, MasterCard, etc). Processed by Stripe.
Secured with SSL
Comments