30
/
AIzaSyAYiBZKx7MnpbEhh9jyipgxe19OcubqV5w
April 1, 2024
Public Timelines
FAQ
Menu
Public Timelines
FAQ
For education
For educational institutions
For teachers
For students
Open cabinet
Create
Close
Create a timeline
Public timelines
Library
FAQ
Download
Export
Duplicate
Premium
Embed
Senior Project
Edit
Updated 8 Dec 2017
0
0
394
Share
Contributors
Created by
Zack Teitelbaum
List of Edits
Attachments
Comments
Events
Registered for EMSE 398
Initiated project
Iron targets ordered $ (300)
Concept Paper drafted
Joined iLab for sputter access
Concept Paper submitted
PowerPoint Slide drafted
PowerPoint Slide submitted
Registered for EMSE 399
Proposal presentation
Proposal document
Precision saw training
EvoVac Deposition System training
Final report
Commencement
Mid-semester presentation
$ (13,866.24)
Periods
Literature review
Gas mixture math $ (200)
Create sputter substrates $ (20) $ (30)
Film depositions
Film analysis SCSAM $ (80)/h Laue $ (800)
$ (33.50)/h 56 h $ (1876)
$ (33.50)/h 112 h $ (3752)
Fringe: 30% $ (1688.40)
University overhead: 60% $ (5199.84)
About & Feedback
Terms
Privacy
Library
2024
©
Time.Graphics
Support 24/7
Cabinet
Get premium
Donate
The service accepts bank transfer (ACH, Wire) or cards (Visa, MasterCard, etc). Processed by Stripe.
Secured with SSL
Excellent (Trustpilot Reviews)
Based on 115+ reviews
Write your own review on
Trustpilot.com
Comments