29
/
en
AIzaSyAYiBZKx7MnpbEhh9jyipgxe19OcubqV5w
June 15, 2023
Create
Public Timelines
Library
FAQ
For education
Cabinet
For educational institutions
For teachers
For students/pupils
Download
Export
Duplicate
Embed
Edit
181 views
0
0
space
Created by
Swaathi Bala
⟶ Updated 30 Nov 2019 ⟶
List of edits
Comments
Events
12 July 2069 - IOC Launch of the settlement with all initial passengers Rings will store the materials needed to construct the next ring
12 July 2071 Pick up new load of resources from Near-Earth to begin next rings constructions New passengers are boarded onto third ring
12 July 2073 Pick up new load of resources from Near-Earth to begin next rings constructions New passengers are boarded into the fourth ring
12 July 2075 Load more CASSSC units of the resources needed for final ring New passengers are boarded onto the fifth ring
13 July 2077 Pick up settlers and resources from Earth for the final ring. Settlement at full capacity and customer assumes responsinility
20 November 2076 Finish all constructions of the sixth ring and complete testing
Periods
7 May 2065 - 18 November 2067 Contract awarded Material collection and construction of first two ring sectors begin
18 September 2067 - 7 January 2069 Launch sections of the ring into orbital location and assembly of the two rings
7 January 2069 - 11 July 2069 Safety checks Facility operation testing Passengers are welcomed on board during this time
13 July 2069 - 12 Jul 2070 Assembly of the third ring
12 July 2070 - 12 December 2070 Safety checks
12 July 2071 - 12 July 2072 Assembly of fourth ring
12 July 2072 - 12 December 2072 Safety checks
12 July 2073 - 13 July 2074 Assembly of fifth ring
12 July 2072 - 12 December 2074 Safety checks
12 July 2075 - 13 July 2076 Assembly of sixth ring
12 july 2076 - 12 December 2076 Safety checks