33
/
AIzaSyB4mHJ5NPEv-XzF7P6NDYXjlkCWaeKw5bc
November 1, 2025
Create a timeline
Public Timelines
For education
For educational institutions
For teachers
For students
Cabinet
For educational institutions
For teachers
For students
Open cabinet
FAQ
Get premium
Close
Create a timeline
Public timelines
FAQ
About & Feedback
Terms
Privacy
FAQ
Support 24/7
Cabinet
Get premium
Donate
Edit
Download
Export
Duplicate
Premium
Embed
Share
proposal timeline
Category:
Other
Updated:
15 Nov 2017
0
0
421
Contributors
Created by
Emma Stalker
Attachments
Comments
Events
Site excavation begins
foundation poured
first floor walls begin
second floor begins
fourth floor begins
wiring for electricity begins
elevator, lights, and kiosk installed
lines and signs installed/finishing touches
dedication and opening ceremony
ground breaking ceremony
third floor begins
About & Feedback
Terms
Privacy
FAQ
Support 24/7
Cabinet
Get premium
Donate
The service accepts bank transfer (ACH, Wire) or cards (Visa, MasterCard, etc). Processed by Stripe.
Secured with SSL
Comments