33
/
AIzaSyAYiBZKx7MnpbEhh9jyipgxe19OcubqV5w
August 1, 2025
Public Timelines
Menu
Public Timelines
FAQ
Public Timelines
FAQ
For education
For educational institutions
For teachers
For students
Cabinet
For educational institutions
For teachers
For students
Open cabinet
Create
Close
Create a timeline
Public timelines
Library
FAQ
Download
Export
Duplicate
Premium
Embed
Share
msc
Category:
Other
Updated:
9 Nov 2018
0
0
300
Contributors
Created by
Chris Trotter
Attachments
Comments
Sony 2011
By
Chris Trotter
26 Oct 2017
0
0
448
Events
Return to Study
Interim Report
Suspend Study
Literature Review
Periods
Project Duration
Study Suspended
Interim Report
Capability Development / Testing
Report / Project Admin
Alternate Approach Assessment
Grouping
Periods
Detection Development
Detection Result Analysis
C2 Detection Testing
Exfiltration Detection Testing
Detection Capability Assessment and Improvement
Data Analysis and Report Creation
Periods
Initial Test Environment Creation
VM Creation and Config
Testing of Required Functionality
Periods
Transmission Development
C2 Traffic Development
Data Exfiltration Traffic Development
Data Analysis and Report Creation
About & Feedback
Terms
Privacy
Library
FAQ
Support 24/7
Cabinet
Get premium
Donate
The service accepts bank transfer (ACH, Wire) or cards (Visa, MasterCard, etc). Processed by Stripe.
Secured with SSL
Comments