33
/
AIzaSyAYiBZKx7MnpbEhh9jyipgxe19OcubqV5w
September 30, 2024
Public Timelines
Menu
Public Timelines
FAQ
Public Timelines
FAQ
For education
For educational institutions
For teachers
For students
Cabinet
For educational institutions
For teachers
For students
Open cabinet
Create
Close
Create a timeline
Public timelines
Library
FAQ
Edit
Download
Export
Duplicate
Premium
Embed
Share
Pump Drive Timeline
Category:
Other
Updated:
24 Oct 2017
Durst Pump Drive Development Timeline
0
0
436
Contributors
Created by
Zach Bower
Attachments
Comments
Events
Durst New Pump Drive Project Launched Replaces Existing Terrell, Federal, and Regal Pump Drives
Developed (9) Model Product Lines Began Testing Prototypes
Released Production Drawings and Tooling Started Production
Released 10th Model ------ 4PD09 ------ (Replaces Legacy Federal 804)
Full Product Line Review and Cost Reduction
Developed Zero Offset Direct Drive (ZODD) Product Line
Released 11th Model ------- 1PD09 ------ (High Capacity & Increased Flexibility)
Released 13th Model ------ 5PD08L ------ (Extreme Temp Applications)
Released 12th Model ------ 4PD10L ------ (Four Pad Inline)
About & Feedback
Terms
Privacy
Library
FAQ
Support 24/7
Cabinet
Get premium
Donate
The service accepts bank transfer (ACH, Wire) or cards (Visa, MasterCard, etc). Processed by Stripe.
Secured with SSL
Comments