PWN (Azmer)
Category:
Other
Updated:
1 Nov 2017
KVMRT2
0
0
540
Contributors
Created by
pokok forest
Attachments
Comments
RS - Eu Jin
By
pokok forest
3 Nov 2017
0
0
593
FOC
By
pokok forest
23 Nov 2017
0
0
495
M3
By
pokok forest
17 Jan 2018
0
0
367
Events
Fc1.2 FAT
Fc2. IT
Cc3. Complete Delivery of RS, WDCS and PWN equipment 1st and 2nd Train (2 Trains)
Cc4. Complete delivery of RS, WDCS and PWN equipment 3rd to 30th Train (28 Trains)
Cc5.1 Complete delivery of RS, WDCS and PWN equipment for Sungai Buloh Depot
Cc5.2 Complete delivery of RS, WDCS and PWN equipment 1st to 14th TPSS/ BSS (14 TPSS/BSS)
Dc1. Complete RS, WDCS and PWN installation: Sungai Buloh Depot
Cc6 Complete delivery of RS, WDCS and PWN equipment Trackside between 1st to 9th Station
Dc2. PAT for RS, WDCS and PWN
Cc7. Complete delivery of RS, WDCS and PWN equipment 1st to 9th Station (9 stations)
Dc3. Complete RS, WDCS and PWN installation 1st Station and 2nd Station
Dc4.1. Complete RS, WDCS and PWN installation
Dc4.2 PAT for RS, WDCS and PWN 1st Station and 2nd Station
Dc5.1 Complete RS, WDCS and PWN installation 6th Station and 7th Station
Dc5.2. PAT for RS, WDCS and PWN 3rd Station, 4th Station and 5th Station
Cc8.1 Complete delivery of RS, WDCS and PWN equipment 15th to 28th TPSS/ BSS (14 TPSS/BSS)
Cc8.2 Complete delivery of RS, WDCS and PWN equipment Trackside between 10th to 18th Station
Cc8.3 Complete delivery of RS, WDCS and PWN equipment 31st to 58th Train (28 Trains)
Dc6.1 Complete RS, WDCS and PWN installation 8th Station and 9th Station
Dc6.2 PAT for RS, WDCS and PWN 6th Station and 7th Station
Dc7. PAT for RS, WDCS and PWN 8th Station and 9th Station
Cc9. Complete delivery of RS, WDCS and PWN equipment Trackside between 19th to 27th Station
Cc10.1 Complete delivery of RS, WDCS and PWN equipment 10th to 18th Stations (9 stations)
Cc10.2 Complete delivery of RS, WDCS and PWN equipment Serdang Depot
Cc11.1 Complete delivery of RS, WDCS and PWN equipment 19th to 27th Stations (9 stations)
Cc11.2 Complete delivery of RS, WDCS and PWN equipment Trackside between 28th to 35th Station
Dc8 Complete RS, WDCS and PWN installation Serdang Depot
Fc3 System Acceptance Tests for Phase 1
Dc9.1 Complete RS, WDCS and PWN installation 10th Station and 11th Station
Dc9,2 PAT for RS, WDCS and PWN Serdang Depot
Dc10.1 Complete RS, WDCS and PWN installation 12th Station, 13th Station and 14th Station
Dc10.2 PAT for RS, WDCS and PWN 10th Station and 11th Station
Cc12 Complete delivery of RS, WDCS and PWN equipment 28th to 35th Station (8 Stations)
Dc11.1 Complete RS, WDCS and PWN installation 15th Station and 16th Station
Dc11.2 Complete RS, WDCS and PWN installation 17th Station and 18th Station
Dc11.3 Complete RS, WDCS and PWN installation 19th Station and 20th Station
Dc11.4. PAT for RS, WDCS and PWN 12th Station, 13th Station and 14th Station
Fb4. SIT for Phase 1
Fc4. SIT for Phase 1
Dc12.1. Complete RS, WDCS and PWN installation 21st Station and 22nd Station
Dc12.2 Complete RS, WDCS and PWN installation 23th Station and 24th Station
Dc12.3 PAT for RS, WDCS and PWN 15th Station and 16th Station
Dc12.3 PAT for RS, WDCS and PWN 15th Station and 16th Station
Dc12.4 PAT for RS, WDCS and PWN 17th Station and 18th Station
Dc12.5 PAT for RS, WDCS and PWN 19th Station and 20th Station
Fb5 Performance Demonstration Test for Phase 1
Fc5 Performance Demonstration Test for Phase 1
Dc13.1 RS, WDCS and PWN installation 25th Station, 26th Station and 27th Station
Dc13.2 Complete and pass PAT for RS, WDCS and PWN 21st Station and 22nd Station
Dc13.3 Complete and pass PAT for RS, WDCS and PWN 23th Station and 24th Station
Dc14.1 Complete RS, WDCS and PWN installation 28th Station, 29th Station and 30th Station
Dc14.2 Complete and pass PAT for RS, WDCS and PWN 25th Station, 26th Station and 27th Station
Fb6.1 Trial Operations for Phase 1
Fc6.1 Complete Trial Operations for Phase 1
Dc15.1 Complete RS, WDCS and PWN installation 31st Station, 32nd Station and 33rd Station
Dc15.2 Complete RS, WDCS and PWN installation 34th Station and 35th Station
Dc15.3 Complete and pass PAT for RS, WDCS and PWN 28th Station, 29th Station and 30th Station
Dc16.1 Complete and pass PAT for RS, WDCS and PWN 31st Station, 32nd Station and 33rd Station
Dc16.2 Complete and pass PAT for RS, WDCS and PWN 34th Station and 35th Station
Dc17 Complete and pass Partial Acceptance Test (PAT) for RS, WDCS and PWN 35th Station
Fb7 SAT for Substantial Completion of RS, WDCS and PWN
Fc7 SAT for Substantial Completion of RS, WDCS and PWN
Fc8.1 Complete and Pass SIT
Fc8.2 Complete and pass Performance Demonstration Test
Fc9.1 Complete Trial Operations
About & Feedback
Terms
Privacy
Library
FAQ
Support 24/7
Cabinet
Get premium
Donate
The service accepts bank transfer (ACH, Wire) or cards (Visa, MasterCard, etc). Processed by Stripe.
Secured with SSL
Comments