Personal Project Grade 10
Created by
Paphinvit Chris Hartono
⟶ Updated 18 Jan 2019 ⟶
List of edits
Comments
Events
Broad Categories Choices Day 1: Choosing which field of interest i'm most interested in
Personal Project Agreed and Finalized Day 4: Consult with Mr Theo (Supervisor) and get a signature for approval
Personal Project: Timeline Day 5: Submit the timeline of the process of the whole project
Personal Project Criteria Day 8: Submit personal product criteria to Mr Theo (Supervisor) and have the Second Official Meeting
Brainstorming #1 Day 2: Brainstorming ideas that could benefit us
Brainstorming #2 Day 3: Stick with the idea of making a Smart Mirror
Meeting Day 6: First official meeting: discussion
Research Day 7: Research more about the Smart Mirror (cost, size, materials)
Research Day 9: Research more about Raspberry Pi, understand how does it function
Midpoint Checkpoint Day 11: Discuss the progress made and have the Third Official Meeting (CHANGED) EDIT: Reconciled with Mr Theo for the change of plan. Instead of Smart Mirror, "Green" Teleprompter is proposed.
Preparation Day 10: Start buying the materials needed
Preparation Day 12: Start making the Smart Mirror (Coding in the Raspberry Pi) EDIT: Start buying Acrylic Sheet 8x10, 2mm thick and Craft Foam.
Preparation Day 13: Coding in the Raspberry Pi #2 EDIT: Prepare bamboo sticks for the tripod/stand of the teleprompter.
Preparation Day 14: Clearing things up and start making the frame EDIT: Start assembling the parts together into place
Preparation Day 15: Finalize the product, add some finishing to it
Draft Report Day 17: Submit a DRAFT report to Mr Theo (Supervisor) for checking and feedback.
Draft Report Day 16: Start making the draft of my report: At least get the idea
Draft Report Day 18: Continue with the draft
Draft Report Day 19: Send draft to Mr Theo (Supervisor)
Draft Report Day 20: Finalizing the draft and make edits
Draft Report Day 21: Submit the Final Report
Personal Project : END
Personal Project: START