Boubyan V2
Category:
Other
Updated:
15 Oct 2017
0
0
376
Contributors
Created by
Ahmed Mostafa
Attachments
Comments
Events
Start of Implementation Health check on all physical switches
Installing and configuring Arista cloud vision Demonstrating Arista ZTP
Upgrade Appliances to latest recommended version and demonstrating the cloud vision devices upgrade ease of use
Apply Management configuration using templates such as: IP configuration. Default route.
Configuring MLAG for ToR switches Configuring BGP between spine and leafs
Layer 2 VLANs. Layer 3 VLANs (if existing).
Access and Trunk ports per VLAN STP configuration
STP configuration Configuring VXLAN VTEP Configuring vMware vCenter and showing Arista powerful integration with vMware
End User Training
Integrating NSX With Arista Switches
About & Feedback
Terms
Privacy
Library
FAQ
Support 24/7
Cabinet
Get premium
Donate
The service accepts bank transfer (ACH, Wire) or cards (Visa, MasterCard, etc). Processed by Stripe.
Secured with SSL
Comments