41
/
AIzaSyB4mHJ5NPEv-XzF7P6NDYXjlkCWaeKw5bc
May 31, 2026
358864
31106
2
Public Timelines
FAQ

17h 34min, sep 18, 2017 y - Safetech Feedback re: cleanup

Description:

From: Gleb Apolonski <gapolonski@safetechenv.com>
Sent: September 18, 2017 6:40 PM
To: werner s
Subject: 24 Holgate Court, Brampton - Post Remediation Air Sampling Results

Good evening Werner,


Results of the mould air sampling conducted on Friday September 15th, 2017 have been deemed satisfactory following our additional recommendation to re-clean the basement using HEPA vacuuming and a re-application of a suitable antimicrobial disinfectant.


Total mould concentrations were observed to be significantly reduced in the post-remediation samples as compared to the background air sampling conducted on September 7th, 2017. No obvious visible mould was observed at the time of our inspection/air sampling. Areas were generally clean and free of significant dust or debris.


Our formal report will follow

Added to timeline:

30 Nov 2017
0
0
539

Date:

17h 34min, sep 18, 2017 y
Now
~ 8 years and 9 months ago