41
/
AIzaSyB4mHJ5NPEv-XzF7P6NDYXjlkCWaeKw5bc
May 31, 2026
10998024
1042196
2
Public Timelines
FAQ

11h 21min, jun 18, 1999 y - Dr. James Gardner converses with Dr. Andrew Evans about OPERATION: DEUS VULT

Description:

Dr. Gardner: "Testing at the Longinus site is complete, correct?"

Dr. Evans: "Yes sir, we're entering the parameter tuning stages now. The final preparations are underway."

Dr. Gardner: "What is the success probability outlook?"

Dr. Evans: "According to calculations, at a hypothesized 99% operational capacity, the success probability is 82.4% plus or minus 1.23%."

Dr. Gardner: "Will you be able to reach 99% operational capacity within the week?"

Dr. Evans: "Yes, we are on track. The Spear of Longinus is currently at 92% operational capacity."

Dr. Gardner: "What are the chances of a contingency scenario?"

Dr. Evans: "Which one?"

Dr. Gardner: "CS-B4."

Dr. Evans: "About 2.3%."

Dr. Gardner: "Then it's acceptable."

Added to timeline:

Date:

11h 21min, jun 18, 1999 y
Now
~ 27 years ago