11h 21min, jun 18, 1999 y - Dr. James Gardner converses with Dr. Andrew
Evans about OPERATION: DEUS VULT
Description:
Dr. Gardner: "Testing at the Longinus site is complete, correct?"
Dr. Evans: "Yes sir, we're entering the parameter tuning stages now. The final preparations are underway."
Dr. Gardner: "What is the success probability outlook?"
Dr. Evans: "According to calculations, at a hypothesized 99% operational capacity, the success probability is 82.4% plus or minus 1.23%."
Dr. Gardner: "Will you be able to reach 99% operational capacity within the week?"
Dr. Evans: "Yes, we are on track. The Spear of Longinus is currently at 92% operational capacity."
Dr. Gardner: "What are the chances of a contingency scenario?"
Dr. Evans: "Which one?"
Dr. Gardner: "CS-B4."
Dr. Evans: "About 2.3%."
Dr. Gardner: "Then it's acceptable."
Added to timeline:
Date:
11h 21min, jun 18, 1999 y
Now
~ 27 years ago