33
/ru/
AIzaSyAYiBZKx7MnpbEhh9jyipgxe19OcubqV5w
August 1, 2025
Public Timelines
Menu
Public Timelines
FAQ
Public Timelines
FAQ
For education
For educational institutions
For teachers
For students
Cabinet
For educational institutions
For teachers
For students
Open cabinet
Создать
Close
Create a timeline
Public timelines
Library
FAQ
Редактировать
Скачать
Export
Создать копию
Premium
Встроить в сайт
Share
HDMI
Category:
Иное
Обновлено:
3 мес назад
0
0
218
Авторы
Created by
Dragana Žanko
Attachments
Comments
LMS
By
Dragana Žanko
1 мес назад
0
0
105
LMS Timeline copy
By
Dragana Žanko
3 мес назад
0
0
81
События
2.4 Review Workshop Phase 2
2.6 Acceptance Phase 2 26.10.2025
3.10 Acceptance Phase 3 03.07.2026
2.2 Review Workshop Phase 2
3.5 Review workshop (LMS version 2.0) including User acceptance test
Периоды
Phase 2 – GUI Design & Prototyping 20.06.2025 - 10.10.2025
2.1 Elaboration of Mockup for GUI
2.3 Adaptation of Mockup based on iterative feedback cycles
Phase 3 – Agile system implementation including IAT, FAT, SAT 10.10.2025 - 17.07.2026
3.1 Implementation of LMS version 1.0 (DB, GUI, BL) including integration of user management according to Table in Part I Requirements Catalogue, Sheet ‘LMS_Versions_FuncRequirements’
3.2 FAT & IAT of LMS version 1.0
3.3. Implementation of LMS version 2.0 including external APIs according to Table in Part I Requirements Catalogue, Sheet ‘LMS_Versions_FuncRequirements’
3.4 FAT & IAT of LMS version 2.0
3.6 Implementation of LMS version 3.0 including external APIs according to Table in Part I Requirements Catalogue, Sheet ‘LMS_Versions_FuncRequirements’
Phase 4 – Installation to operational environment and stability performance tests 17.07.2026 - 23.10.2026
4.3 Adaptations towards successful OAT and implementation of final version LMS
Phase 5 – System Operation 23.10.2026 - 4 year duration
2.5 Adaptation and finalization of Mockup based on iterative feedback cycles
4.2 Operational acceptance test (OAT)
3.9 Adaptation towards successful SAT and impmenetation of full version LMS 3.0
4.1 Installation and stability and performance test (support)
3.7 FAT & IAT of LMS version 3.0
3.8 Site Acceptance Test (SAT) of LMS version 3.0 including installation and support
Группировать
Group of events
События
1.1 Kick-off Workshop
1.3 Review Workshop Phase 1
1.5 Acceptance Phase 1 06.06.2025
Project start
Периоды
Phase 1 – Requirements Specification and System Concept 14.04.2025 - 20.06.2025
1.2 Elaboration of Requirements Specifications, System Concept including architecture, DB, basic GUI structure, APIs as well as a Test and Acceptance Manual
1.4 Adaptation of Requirements Specifications, System Concept including architecture, DB, basic GUI structure, APIs as well as a Test and Acceptance Manual
Group of events
События
4.4 Acceptance Phase 4 09.10.2026
About & Feedback
Соглашение
Приватность
Библиотека
FAQ
Support 24/7
Cabinet
Get premium
Donate
The service accepts bank transfer (ACH, Wire) or cards (Visa, MasterCard, etc). Processed by Stripe.
Secured with SSL
Comments