33
/ru/
AIzaSyAYiBZKx7MnpbEhh9jyipgxe19OcubqV5w
August 1, 2025
Public Timelines
Menu
Public Timelines
FAQ
Public Timelines
FAQ
For education
For educational institutions
For teachers
For students
Cabinet
For educational institutions
For teachers
For students
Open cabinet
Создать
Close
Create a timeline
Public timelines
Library
FAQ
Редактировать
Скачать
Export
Создать копию
Premium
Встроить в сайт
Share
Cajun Chevron
Category:
Иное
Обновлено:
26 сен 2022
Mostly deals with the RFIs
0
0
328
Авторы
Created by
Deedee Franklin
Attachments
Comments
6124-QC docs
By
Deedee Franklin
30 янв 2023
0
0
495
События
FCD - PBOP: Change T/PL elevation for Area 9A Pump pad embedded plates Rev 0
FCD - PBOP: Bolt Projection on Type F3C Walkway foundation Rev 0
FCD - PBOP: Excavation of MPS Foundation in Area K-1 Rev 0
FCD - PBOP: WTF Duct bank for cathodic protection Rev 0
FCD - PBOP: P-2791/A Underground Obstructions Rev 0
FCD - PBOP: Area 9 Sleeper Rack Grid line 24 changes Rev 0
FCD - PBOP: Culvert pipe into existing weir box Area 9 Rev 0
FCD - PBOP: Coordinates and anchor bolts Rev 0
FCD - PBOP: Fiber Optic Junction Box Rev 0
FCD - PBOP: PCI FCD 1219 MPS supports too high due to existing steel off elevation Rev 0
FCD - PBOP: 34-R1 Piling Interference Rev 0
FCD - PBOP: PCI NCR 526 Concrete is off Rev 0
FCD - PBOP: Request change to sluice gate type for Area 9A Rev 0
FCD - PBOP: 209' culvert pipe in 82 cooling tower area Rev 0
FCD - PBOP: 82 General Relocation of Street Lighting Piles Rev 0
FCD - PBOP: PCI NCR 566 Handrails are fabbed wrong Rev 0
FCD - PBOP: Steam Trap Supports at Tank Heater locations Rev 0
FCD - PBOP: Rack 5 Heat Tracing Equipment Rack Rev 0
FCD - PBOP: West Tank Farm Area 34D1 Rev 0
FCD - PBOP:Install Safety Handrall Around Open Former Berth Rev 0
FCD - PBOP: Construct Walkway per client request Rev 0
FCD - PBOP: HDPE FW line interference Rev 0
FCD - PBOP: OWS Line interfering with Anchor bolt Rev 0
FCD - PBOP: Y1 Pile 82017 early refusal Rev 0
FCD - PBOP: Area 9 Sleeper Rack misc interferences Rev 0
FCD - PBOP: Area 34-9A Rack 3 F2 Foundation Rev 0
FCD - PBOP: F-8280 Piers Anchor Bolt Length Change Rev 0
FCD - PBOP: Use of Vibratory hammer Rev 0
FCD - PBOP: Bolt area in Area 9 sleeper rack Rev 0
FCD - PBOP: Location of pedestal centerline Rev 0
FCD - PBOP: Area 9 Sleeper Rack Type f12 interference Rev 0
FCD - PBOP: Tea support footings Rev 0
FCD - PBOP: Raise BOC for Type f11 Area 9 sleeper rack Rev 0
FCD - PBOP: IDW Area 82 K1 Cooling Tower Area Rev 0
FCD - PBOP: Concrete pad Berth 9 Trestle Electric Heat Rev 0
FCD - PBOP: Changes to MES-34B1 Rev 0
FCD - PBOP: East ETP Road Culvert Rev 0
FCD - PBOP: Underground pipe impedes the placement of Type 1 foundation Rev 0
FCD - PBOP: Ductbank stub ups too low Rev 0
FCD - PBOP: Anderson Road Modification coordinate changes Rev 0
FCD - PBOP: Pipe Penetration east end of Area 9 Rev 0
FCD - PBOP: 82Z1 Relocate light pole Rev 0
FCD - PBOP: Use of 16" pipe piles in lieu of 12" design Rev 0
FCD - PBOP: MES Area 9 anchor bolt Rev 0
FCD - PBOP: PCI FCD 630 Existing foundation Rev 0
FCD - PBOP: Repair and relocate existing U/G SWS line Rev 0
FCD - PBOP: Top Mat Section B for Analyzer Building Plants Rev 0
FCD - PBOP: Relocate 95 Plant U/G FW Tie Rev 0
FCD - PBOP: Type F8 Area 9A Sleeper Rack Rev 0
FCD - PBOP: Valve handles on firewater hose connections Rev 0
FCD - PBOP:Bolts for Type F3B and F3C Rev 0
FCD - PBOP: Relocation of HTP 45 7A-1 Concrete Pad Rev 0
FCD - PBOP: Plant 15 Foundations Rev 0
FCD - PBOP: Obstruction in installing beams Rev 0
FCD - PBOP: Type 1 Foundation Plant 95 MPS Rev 0
FCD - PBOP: SK9580 Grout Rev 0
FCD - PBOP: Relocation of heat Tracing Equipment Rev 0
FCD - PBOP: Tie beam interference with P 2230 foundation Rev 0
FCD - PBOP: Redesign of 34E1 black oil foundation Rev 0
FCD - PBOP: TOC for ETF walkaway foundation Rev 0
FCD - PBOP: Steps for Analyzers Buildings for 90,91 and 92 Rev 0
FCD - PBOP: Raise Bottom of pipe Bridge Foundation Rev 0
FCD - PBOP: Type F6 and F8 Foundation Rev 0
FCD - PBOP: Area 9 Vent Gas Rev 0
FCD - PBOP: P 9500/A Foundation changes Rev 0
FCD - PBOP: Modification to SK- 9533 piling Rev 0
FCD - PBOP: Relocate Foundation for 015 SP Rev 0
FCD - PBOP: Bollards at SK-9533 Rev 0
FCD - PBOP: MPS 34A1-005 under type F3A Rev 0
FCD - PBOP: South stairs at SK-9589 Rev 0
FCD - PBOP: Modification to Paving and Asphalt Road Rev 0
FCD - PBOP: 2" UG FW Tie in TP-095 -1095 Rev 0
FCD - PBOP: SIDS issue at CEMS building steps Rev 0
FCD - PBOP: Airgas bottles around CEMS Rev 0
FCD - PBOP: Plant 95 as builds and client request Rev 0
FCD - PBOP: Missing grounding info Rev 0
FCD - PBOP: Chemical Package Area 82 K1 Rev 0
FCD - PBOP: Supersede HSR-FCD-27 Rev 0
FCD - PBOP: Marine Revetment Rev 0
FCD - PBOP: Add Construction Joint to sump Walls Rev 0
FCD - PBOP: Install Seal Slab Rev 0
FCD - PBOP: Z1 Sump Whaler Installation Rev 0
FCD - PBOP: K1 Area Piers Interfere Rev 0
FCD - PBOP: Q4 support Q4 A14 Rev 0
FCD - PBOP: 2EA type F3 Rev 0
FCD - PBOP: Conflict between Ductbank and Type 1 Piers Rev 0
FCD - PBOP: QF Supports Rev 0
FCD - PBOP: Area 9 Pump Pad Cajun FCD 74 Rev 0
FCD - PBOP: Area 9 Pump Pad Cajun FCD 76 Rev 0
FCD - PBOP: WTF C1, D1 and E1 sleeper foundation Rev 0
FCD - PBOP: Location of 2EA type 2 Rev 0
FCD - PBOP: Area 042 Piping Coordinates Rev 0
FCD - PBOP: Area 042 Piping Coordinates Cajun RFI 148 Rev 0
FCD - PBOP: Area 9 and 9A pump pad Rev 0
FCD - PBOP: K1 Foundation Obstruct Rev 0
FCD - PBOP: Area 9 Pump Pad Cajun FCD 82 Rev 0
FCD - PBOP: Area 9 Sleeper Rack Foundation Pier Rev 0
FCD - PBOP: Supersede FCD 00234 Rev 0
FCD - PBOP: Install Concrete Ramp Rev 0
FCD - PBOP: P9500/A Foundation Obstructions Rev 0
FCD - PBOP: Area 37 Fire Monitor Hose Rev 0
FCD - PBOP: WTF Area 034 Duct Bank Rev 0
FCD - PBOP: Change OWS Piping Elevation Rev 0
FCD - PBOP: F4 Foundation at Area 9A Rev 0
FCD - PBOP: Area 45 Duct Bank Rev 0
FCD - PBOP: Conflict between Clean out Elevation and Finish Concrete Elevation in 27 Plant Rev 0
FCD - PBOP: C-8820 Offset rebar for bottom Rev 0
FCD - PBOP: Ductbank riser Rev 0
FCD - PBOP: Revise B3 Foundation to Clear Existing Obstructions Rev 0
FCD - PBOP: W1 C-8220 Extend the F3 Foundation North Rev 0
FCD - PBOP: Sleep Rack Area 9 Rev 0
FCD - PBOP: F 8280 Piers Anchor bolt length change Rev 0
FCD - PBOP: Existing Piping Location Discrepancies Rev 0
FCD - PBOP: Foundation 34E1SL08 Rev 0
FCD - PBOP:Sump P-34438 Drains Rev 0
FCD - PBOP: Plant 27 HRS Foundations Rev 0
FCD - PBOP: Plant 27 HRS Foundations Cajun FCD 108 Rev 0
FCD - PBOP: WTF Piping Modifications Rev 0
FCD - PBOP: Rack 4 Sonotube Rev 0
FCD - PBOP: New F3C Foundation Conflict with Existing Rev 0
FCD - PBOP: TP -095 1942 in 95 plant Rev 0
FCD - PBOP: U1 FUL 3310 02 Piping Obstruction Rev 0
FCD - PBOP: Type 6 MPS in 95 Plant Rev 0
FCD - PBOP: Dimension Clarification Area 9 and 9A Rev 0
FCD - PBOP: Elevation Change to OWS Piping Rev 0
FCD - PBOP: Black Oil Line Interference with New Foundation Rev 0
FCD - PBOP: Area D 4210E Platform Rev 0
FCD - PBOP: WTF Modifications to Avoid Tank Settlement Rev 0
FCD - PBOP: Relocate New Pad Due to Existing Light Pole Rev 0
FCD - PBOP: Rasie Bottom of Concrete of F5 Foundation Rev 0
FCD - PBOP: SL24 and SL25 Foundation Rev 0
FCD - PBOP: Firewall Valve Installation Rev 0
FCD - PBOP: Type 3 MPS 4" interfere Rev 0
FCD - PBOP: Relocation of OWS piping due to obstructions Rev 0
FCD - PBOP: TP - 1938 Firewater Tie in 95 plant Rev 0
FCD - PBOP: 95 plant area paving Rev 0
FCD - PBOP: F10 Foundation Rev 0
FCD - PBOP: 34 ETF Area 9 MPS Installer Rev 0
FCD - PBOP: Additional Sono Tube Rev 0
FCD - PBOP: Vent Glass Treater Step Rev 0
FCD - PBOP: 30" x 10" Branch Saddle Connection Rev 0
FCD - PBOP: Area paving around the 2756 Foundation in 27 plants Rev 0
FCD - PBOP: Additional Sono Tube Supports at Pipe Rack 4 Rev 0
FCD - PBOP: E9507A Foundation Dowels Rev 0
FCD - PBOP: Sediment Basin Drain Header Rev 0
NCR - PBOP: Subcontract/PO number - CAJ C853562 Discipline: Structural Rev 0
NCR - PBOP: Subcontract/PO number - CAJ C853562 Discipline: Civil Rev 0
NCR - PBOP: Subcontract/PO number - CAJ C853562 Discipline: Piping Rev 0
NCR - PBOP: Subcontract/PO number - CAJ C853562 Discipline: Civil/Piling Rev 0
NCR - PBOP: Subcontract/PO number - CAJ C853562 Discipline: Piping/Supports Rev 0
NCR - PBOP: Subcontract/PO number - CDF C833546 Discipline: Piling/Civil Rev 0
NCR - PBOP: Subcontract/PO number - KBR C834242 Discipline: Civil/ Concrete Rev 0
NCR - PBOP: Subcontract Old Castle Discipline: Civil/ Concrete Rev 0
NCR - PBOP: Subcontract/PO number - CAJ C853562 Discipline: civil/concrete Rev 0
NCR - PBOP: Subcontract/PO number - CAJ C853562 Discipline: civil/sitework Rev 0
NCR - PBOP: Subcontract/PO number - SHAW PS02 Discipline: Piping/Pipe Rev 0
NCR - PBOP: Subcontract/PO number - NA Discipline: Civil/Concrete Rev 0
NCR - PBOP: Subcontract/PO number - CAJ C853562 Discipline: civil/concrete Rev 1
NCR - PBOP: Subcontract/PO number - CAJ C853562 Discipline: Piping/Pipe Rev 0
NCR - PBOP: Subcontract/PO number - CAJ C853562 Discipline: Structural/Support Rev 0
NCR - PBOP: Subcontract/PO number - CAJ C853562 Discipline: civil/concrete Rev 1
NCR - PBOP: Subcontract/PO number - CAJ C853562 Discipline: Piping/Pipe Rev 1
NCR - PBOP: Subcontract/PO number - CAJ C853562 Discipline: Civil/Piling Rev 0
NCR - PBOP: Subcontract/PO number - NA Discipline: Civil/Concrete Rev 0
NCR - PBOP: Subcontract/PO number - CAJ C853562 Discipline: Civil/Piling Rev 1
NCR - PBOP: Subcontract/PO number - CAJ C853562 Discipline: Civil/Piling Rev 1
NCR - PBOP: Subcontract/PO number - CAJ C853562 Discipline: civil/concrete Rev 2
NCR - PBOP: Subcontract/PO number - CAJ C853562 Discipline: Piping/Pipe Rev 1
NCR - PBOP: Subcontract/PO number - CAJ C853562 Discipline: Piping/Pipe Rev 2
NCR - PBOP: Subcontract/PO number - CAJ C853562 Discipline: civil/concrete Rev 1
NCR - PBOP: Subcontract/PO number - CAJ C853562 Discipline: civil/concrete Rev 2
NCR - PBOP: Subcontract/PO number - NA Discipline: Civil/Concrete Rev 2
NCR - PBOP: Subcontract/PO number - CDF C833546 Discipline: Civil/Piling Rev 0
NCR - PBOP: Subcontract/PO number - CAJ C853562 Discipline: Structural/Support Rev 0
NCR - PBOP: Subcontract/PO number - CDF C833546 Discipline: Civil/Piling Rev 1
NCR - PBOP: Subcontract/PO number - CAJ C853562 Discipline: civil/concrete Rev 0
NCR - PBOP: Subcontract Old Castle Discipline: Civil/ Sitework Rev 0
NCR - PBOP: Subcontract/PO number - NA Discipline: Structural/Steel Rev 0
NCR - PBOP: Subcontract/PO number - CDF C833546 Discipline: Civil/Piling Rev 2
NCR - PBOP: Subcontract/PO number - CAJ C853562 Discipline: civil/concrete Rev 4
NCR - PBOP: Subcontract/PO number - CAJ C853562 Discipline: Structural/Steel Rev 0
NCR - PBOP: Subcontract Old Castle Discipline: Civil/ Sitework Rev 0
RFI - PBOP: West Tank Pump pad Area Rev 0
RFI - PBOP : Area 9 Sump 34528 Rebar Dowels Rev 0
RFI - PBOP: Coordinates for WTF C1 Pump Rev 0
RFI - PBOP: C1 and D1 Pump pad foundation Rev 0
RFI - PBOP: F1 Foundation at C1 Pump Rev 0
RFI - PBOP: Proof Roll of 222 Plant Oxygen Rev 0
RFI - PBOP: Tie in TP 42-7300 Cajun RFI 154 Rev 0
RFI - PBOP: 27 Plant B3 Foundations Rev 0
RFI - PBOP: Guard post at the vaporizer Rev 0
RFI - PBOP: Drawing Clarification Vent Gas Rev 0
RFI - PBOP: 27 plant foundation in conflict Rev 0
RFI - PBOP: Anchor bolt template Rev 0
RFI - PBOP: Area 34 C1 Walkaway foundation Coordinate discrepancy Rev 0
RFI - PBOP: Bolt and gasket material clarification rev 0
RFI - PBOP: Bolt projection and grout details Rev 0
RFI - PBOP: Area 34 C1 Misc Rev 0
RFI - PBOP: Area 45 Duct bank rebar conflict Rev 0
RFI - PBOP: S1 C-8289 Foundation and MPS 8251-003 rev 0
RFI - PBOP: Coordinates for PTLF Foundation Rev 0
RFI - PBOP: Use of Flowable Fill in lieu of Sand Backfill Rev 0
RFI - PBOP: Alternate Structural Grout Cajun RFI Rev 0
Transmittal Area 95 TP-095-1941 and 1942 Rev 0
Package of Transmittals Rev 0
Letter of Transmittal Chevron Pascagoula Refinery Rev 0
Foundation Plan & Sections - Rev 0
Embed Plate, Plans, Sections & Details - Rev 0
Foundation Plan & Sections - Rev 1
About & Feedback
Соглашение
Приватность
Библиотека
FAQ
Support 24/7
Cabinet
Get premium
Donate
The service accepts bank transfer (ACH, Wire) or cards (Visa, MasterCard, etc). Processed by Stripe.
Secured with SSL
Comments