KAAEC Villa
Category:
Иное
Обновлено:
31 янв 2018
2
0
1423
Авторы
Created by
Maen Haj Khalaf
Attachments
Comments
События
Friday
Friday
Friday
Friday
Friday
Friday
Totally Cleaning
Прогресс события
SITE WORKS
Concrete Works 01
Concrete works 02 and Isolate
Concrete Works 03
Concrete Work 04 , Isolate, Filling
Grade Beams , Fence Drainage & Waste Water
Filling , Isolate ,Slabs, Grounding
column ,Fence ,
Slab Of First Floor
column Of First Floor
Slab Of Annex Floor
Column Of Roof , HVAC Work, Fence
Slab Of Roof, Fence , Annex Vest , HVAC Ground Floor
Project completed
Roof and Annex Vest ,HVAC ,Electrical and Drain ,Walls
AAC Walls , HVAC, Electric, Drainage
Walls , Fence
Electrical , Mechanical ,ACCESSIBLE ROOFING
Interfaces , Wall Indoor,Isolate
Painting ,Walls Tilling
Windows , Aluminum Screen
Ceiling ,
Flooring Tiles
Electrical , Drainage,HVAC
AC
Doors , Metal works
painting
LandSceap
Furneture
About & Feedback
Соглашение
Приватность
Библиотека
FAQ
Support 24/7
Cabinet
Get premium
Donate
The service accepts bank transfer (ACH, Wire) or cards (Visa, MasterCard, etc). Processed by Stripe.
Secured with SSL
Comments