TRL6
Category:
Иное
Обновлено:
9 мар 2021
0
0
174
Авторы
Created by
Oliver Shepherd
Attachments
Comments
События
Move to T3
Victa 02 move to the Camber
Move to T3
Периоды
Phase 4 trials
Hydraulic optimisation design phase
Marketing window
Hydraulic optimisation fit out and commissioning
Hydraulics
Seats
In water testing
Marketing Window
RADAR and Camera integration design phase
Fire detection and suppression design phase
Fire detection/suppression
Phase 3 Commissioning
About & Feedback
Соглашение
Приватность
Библиотека
FAQ
Support 24/7
Cabinet
Get premium
Donate
The service accepts bank transfer (ACH, Wire) or cards (Visa, MasterCard, etc). Processed by Stripe.
Secured with SSL
Comments