33
/ru/
AIzaSyB4mHJ5NPEv-XzF7P6NDYXjlkCWaeKw5bc
November 30, 2025
Create a timeline
Public Timelines
For education
For educational institutions
For teachers
For students
Cabinet
For educational institutions
For teachers
For students
Open cabinet
FAQ
Close
Create a timeline
Public timelines
FAQ
About & Feedback
Соглашение
Приватность
FAQ
Support 24/7
Cabinet
Get premium
Donate
Редактировать
Скачать
Export
Создать копию
Premium
Встроить в сайт
Share
Senior Project
Category:
Иное
Обновлено:
8 дек 2017
0
0
514
Авторы
Created by
Zack Teitelbaum
Attachments
Comments
События
Registered for EMSE 398
Initiated project
Iron targets ordered $ (300)
Concept Paper drafted
Joined iLab for sputter access
Concept Paper submitted
PowerPoint Slide drafted
PowerPoint Slide submitted
Registered for EMSE 399
Proposal presentation
Proposal document
Precision saw training
EvoVac Deposition System training
Final report
Commencement
Mid-semester presentation
$ (13,866.24)
Периоды
Literature review
Gas mixture math $ (200)
Create sputter substrates $ (20) $ (30)
Film depositions
Film analysis SCSAM $ (80)/h Laue $ (800)
$ (33.50)/h 56 h $ (1876)
$ (33.50)/h 112 h $ (3752)
Fringe: 30% $ (1688.40)
University overhead: 60% $ (5199.84)
About & Feedback
Соглашение
Приватность
FAQ
Support 24/7
Cabinet
Get premium
Donate
The service accepts bank transfer (ACH, Wire) or cards (Visa, MasterCard, etc). Processed by Stripe.
Secured with SSL
Comments