33
/ru/
AIzaSyAYiBZKx7MnpbEhh9jyipgxe19OcubqV5w
October 1, 2025
Create a timeline
Public Timelines
For education
For educational institutions
For teachers
For students
Cabinet
For educational institutions
For teachers
For students
Open cabinet
FAQ
Получить премиум
Close
Create a timeline
Public timelines
Library
FAQ
About & Feedback
Соглашение
Приватность
Библиотека
FAQ
Support 24/7
Cabinet
Get premium
Donate
The service accepts bank transfer (ACH, Wire) or cards (Visa, MasterCard, etc). Processed by Stripe.
Secured with SSL
Скачать
Export
Создать копию
Premium
Встроить в сайт
Share
HOA timeline
Category:
Иное
Обновлено:
31 янв 2020
0
0
221
Авторы
Created by
menacezone
Attachments
Comments
События
Pond Study
"WET" detention (hybrid/stormwater basin) pond design included in preliminary phase 1 documents
City Contract Approved - City will NEVER be responsible for landscaping/pond upkeep. MUST replace dead trees, etc.
HOA formed. Dues set $650 based on 1. detention = dry (false assumption) 2. unrealistic landscaping expectation (water + upkeep)
HOA bylaws signed
First Texas pays $0, leaves deficit in the budget ($6475) 2016 budget: $0 2016 actual: $14k (mgmt co + landscaping)
All Fountains running. All areas now watering. Electric and Water expenses begin Landscaping begins
First Tx pays $65.8k leaves $6679 deficit for the year 2017 budget: Electric + Pond: $720 Water + landscaping: 30k 2017 Actual: pond + electric for year 13k Landscaping + water $66k
2018 budget set by 1st Tx electric + pond: $44.4k lanscaping + water: $63.2k Dues raised to $780
John Gray elected to board
2019 budget set by 1st Tx, 2019 Budget: electric + pond: $19.8k lanscaping + water: $79.7k with *budgeted deficit* of $27106 Dues raised to $936
First Texas pays: $57k leaves deficit of 15.5k 2018 Budget: electric + pond: $44.4k lanscaping + water: $63.2k 2018 Actual: electric + pond: $29.3k landsaping + water: $82.9k (18 trees died/replaced)
John Gray begins to fix water problems stops overpayment decreases water use receives refunds for previous overpayment
4 additional board members elected 1st Tx cedes control of HOA.
HOA board sets 2020 budget Electric + pond: $28.6k landscape + water: $61.6 Dues raised to $1030 (not the full 20% allowed)
1st Texas pays $0 HOA with $350 in the bank and 15k in bills (as of November 2019) Actuals Jan-Nov2019: Electric+pond: $21.4k landscape + water: $56.7k
Budget set for 2017 Electric + Pond: $720 Water + landscaping: 30k
2016 budget set: $0
About & Feedback
Соглашение
Приватность
Библиотека
FAQ
Support 24/7
Cabinet
Get premium
Donate
The service accepts bank transfer (ACH, Wire) or cards (Visa, MasterCard, etc). Processed by Stripe.
Secured with SSL
Comments