33
/ru/
AIzaSyB4mHJ5NPEv-XzF7P6NDYXjlkCWaeKw5bc
November 1, 2025
Create a timeline
Public Timelines
For education
For educational institutions
For teachers
For students
Cabinet
For educational institutions
For teachers
For students
Open cabinet
FAQ
Получить премиум
Close
Create a timeline
Public timelines
FAQ
About & Feedback
Соглашение
Приватность
FAQ
Support 24/7
Cabinet
Get premium
Donate
Редактировать
Скачать
Export
Создать копию
Premium
Встроить в сайт
Share
CPMT
Category:
Иное
Обновлено:
17 мая 2019
0
0
241
Авторы
Created by
ahmed shingaly
Attachments
Comments
События
1. Tracking Secondary and Temporary Concrete Construction Objects Using 3D Imaging Technologies
3. Automated Progress Monitoring Using Unordered Daily Construction Photographs and IFC-Based Building Information Models
4. Assessing research issues in Automated Project Performance Control (APPC)
5. Tracking the Built Status of MEP Works: Assessing the Value of a Scan-vs.-BIM System
6. Benefits and Barriers of Construction Project Monitoring Using High-Resolution Automated Cameras
7. Construction performance monitoring via still images, time-lapse photos, and video streams: Now, tomorrow, and the future
8. Onsite 3D marking for construction activity tracking
9. Model to Predict the Impact of a Technology on Construction Productivity
11. Image-Based Localization and Content Authoring in Structure-from-Motion Point Cloud Models for Real-Time Field Reporting Applications
13. Editorial Announcement Regarding Title Change of Journal of the Korean Society of Neonatology to Neonatal Medicine
14. Integration of global positioning system and inertial navigation for ubiquitous context-aware engineering applications
17. Vision-based action recognition of earthmoving equipment using spatio-temporal features and support vector machine classifiers
18. Learning and classifying actions of construction workers and equipment using Bag-of-Video-Feature-Words and Bayesian network models
Периоды
2. Integrated Sequential As-Built and As-Planned Representation with D4AR Tools in Support of Decision-Making Tasks in the AEC/FM Industry
10. Activity Analysis for Direct-Work Rate Improvement in Construction
12. A framework for using mobile computing for information management on construction sites
About & Feedback
Соглашение
Приватность
FAQ
Support 24/7
Cabinet
Get premium
Donate
The service accepts bank transfer (ACH, Wire) or cards (Visa, MasterCard, etc). Processed by Stripe.
Secured with SSL
Comments