33
/it/
AIzaSyB4mHJ5NPEv-XzF7P6NDYXjlkCWaeKw5bc
November 1, 2025
553576
167834
2
Public Timelines
FAQ Ricevere il Premium

Cost Analysis (1 dic 2018 anni – 5 dic 2018 anni)

Descrizione:

-Checking the types of material available
-Selecting the most effective and economical material for the turbine.
-Checking on cost of other accessories required to install the turbine.
-Checking on the installation cost.
Finding means to reduce on the overall cost of the project.

Aggiunto al nastro di tempo:

Data:

1 dic 2018 anni
5 dic 2018 anni
~ 4 days