33
/it/
AIzaSyAYiBZKx7MnpbEhh9jyipgxe19OcubqV5w
August 1, 2025
Public Timelines
Menu
Public Timelines
FAQ
Public Timelines
FAQ
For education
For educational institutions
For teachers
For students
Cabinet
For educational institutions
For teachers
For students
Open cabinet
Creare
Close
Create a timeline
Public timelines
Library
FAQ
Modificare
Scaricare
Export
Creare una copia
Premium
Integrare nel sito Web
Share
LMS Timeline copy
Category:
Storia
è stato aggiornato:
3 mesi fa
0
0
76
Autori
Created by
Dragana Žanko
Attachments
Comments
HDMI
By
Dragana Žanko
3 mesi fa
0
0
212
LMS
By
Dragana Žanko
1 mesi fa
0
0
104
Eventi
1.1 Kick-off Workshop 09.04.2025
1.3 Review Workshop Phase 1 26.05.2025
1.5 Acceptance Phase 1 10.06.2025
2.4 Review Workshop Phase 2 14.08.2025
2.6 Acceptance Phase 2 26.09.2025
3.10 Acceptance Phase 3 17.07.2026
2.2 Review Workshop Phase 2 04.07.2025
3.5 Review workshop (LMS version 2.0) including User acceptance test 27.03.2026
4.4 Acceptance Phase 4 23.10.2026
Project start 31.03.2025
Periodi
Phase 1 – Requirements Specification and System Concept 31.03.2025 - 06.06.2025
1.2 Elaboration of Requirements Specifications, System Concept including architecture, DB, basic GUI structure, APIs as well as a Test and Acceptance Manual
1.4 Adaptation of Requirements Specifications, System Concept including architecture, DB, basic GUI structure, APIs as well as a Test and Acceptance Manual
Phase 2 – GUI Design & Prototyping 06.06.2025 - 26.09.2025
2.1 Elaboration of Mockup for GUI
2.3 Adaptation of Mockup based on iterative feedback cycles
Phase 3 – Agile system implementation including IAT, FAT, SAT 26.09.2025 - 17.07.2026
3.1 Implementation of LMS version 1.0 (DB, GUI, BL) including integration of user management according to Table in Part I Requirements Catalogue, Sheet ‘LMS_Versions_FuncRequirements’
3.2 FAT & IAT of LMS version 1.0
3.3. Implementation of LMS version 2.0 including external APIs according to Table in Part I Requirements Catalogue, Sheet ‘LMS_Versions_FuncRequirements’
3.4 FAT & IAT of LMS version 2.0
3.6 Implementation of LMS version 3.0 including external APIs according to Table in Part I Requirements Catalogue, Sheet ‘LMS_Versions_FuncRequirements’
Phase 4 – Installation to operational environment and stability performance tests 17.07.2026 - 23.10.2026
4.3 Adaptations towards successful OAT and implementation of final version LMS
Phase 5 – System Operation 23.10.2026 - 4 year duration
2.5 Adaptation and finalization of Mockup based on iterative feedback cycles
4.2 Operational acceptance test (OAT)
3.9 Adaptation towards successful SAT and impmenetation of full version LMS 3.0
4.1 Installation and stability and performance test (support)
3.7 FAT & IAT of LMS version 3.0
3.8 Site Acceptance Test (SAT) of LMS version 3.0 including installation and support
About & Feedback
Accordo
Privatezza
Biblioteca
FAQ
Support 24/7
Cabinet
Get premium
Donate
The service accepts bank transfer (ACH, Wire) or cards (Visa, MasterCard, etc). Processed by Stripe.
Secured with SSL
Comments