33
/it/
AIzaSyAYiBZKx7MnpbEhh9jyipgxe19OcubqV5w
August 1, 2025
Public Timelines
Menu
Public Timelines
FAQ
Public Timelines
FAQ
For education
For educational institutions
For teachers
For students
Cabinet
For educational institutions
For teachers
For students
Open cabinet
Creare
Close
Create a timeline
Public timelines
Library
FAQ
Modificare
Scaricare
Export
Creare una copia
Premium
Integrare nel sito Web
Share
M60A Conti.
Category:
Altro
è stato aggiornato:
19 feb 2020
0
0
290
Autori
Created by
johnzhou
Attachments
Comments
M60A shipment plan
By
johnzhou
25 feb 2020
0
0
234
Eventi
Conti. WH reported M60A 0KM failures
Unit#1 ship back to Conti. WH for re-verification
Conti. WH shiped unit#1 to Micron for FA
Micron received unit#1 and preliminary report shared at same day
Final report shared as NO FAILURE FOUND
Unit#1 failed to re-verification at Conti. WH under this specific condition
Conti. R&D confirmed failure occurred on the fast VCC ramp rate and high temp.
Unit#2 analysis in Continental R&D SGP and Micron FAE involved
Unit#1 sent back again to Micron for replicate
Micron collected the 2nd failure
Replicated failure with the specific condition provided by Conti. R&D
Periodi
Electrical FA @Micron SGP
Confirmed the same failed mode as Unit 1
About & Feedback
Accordo
Privatezza
Biblioteca
FAQ
Support 24/7
Cabinet
Get premium
Donate
The service accepts bank transfer (ACH, Wire) or cards (Visa, MasterCard, etc). Processed by Stripe.
Secured with SSL
Comments