Nobleton EA
Category:
Altro
è stato aggiornato:
9 dic 2019
0
0
406
Autori
Created by
s1pereira
Attachments
Comments
Baseline 1
By
s1pereira
2 dic 2019
0
0
416
Eventi
Jul 7 -Kick off Meeting
Dec 10- Final Submission Tech Memo #1
Mar 1- System Capacity Optimization study (W)
Mar 1- Hydraulic Modelling Study (W)
Jan 17- System Capacity Optimization Study (WW)
Jan 17- Hydraulic Modeling Study (WW)
Feb 7- Final Submission: Tech Memo #2
Oct 8- Public Consultation #2
Jan 20- Final Submission: Tech Memo #3
Apr 13- Public Consultation #3
Mar 11- Final Submission: Tech Memo #4
Mar 25- Final Submission: Environmental Study report (pre 30 day review)
Jun 4- Final Submission: Needs Assessment and Justification Study (W)
May 30- Final Submission: Needs Assessment and Justification Study (WW)
Oct 4- Final Submission: Assimilative Capacity Study
Feb 28-Public Consultation #1
Feb 26- Final Submission: Hydrogeological Study(HG)
About & Feedback
Accordo
Privatezza
Biblioteca
FAQ
Support 24/7
Cabinet
Get premium
Donate
The service accepts bank transfer (ACH, Wire) or cards (Visa, MasterCard, etc). Processed by Stripe.
Secured with SSL
Comments