19 ore 12 min, 14 giug 2015 anni - Support House With 24ft Header

Descrizione:

At this point 3/4 of the crawl is done. That's enough to get the supports in. Poured 3 concrete footings, built a 24ft header, and got a few 20ton jacks. Lifted the house up to remove the weight from the load bearing wall that needs replaced