29
/fr/
fr
AIzaSyAYiBZKx7MnpbEhh9jyipgxe19OcubqV5w
April 1, 2024
Créer
Public Timelines
Bibliothèque
FAQ
For education
Cabinet
For educational institutions
For teachers
For students/pupils
Télécharger
Export
Créer une copie
Intégrer dans le site Web
Éditer
Les affichages 302
0
0
S06 ORT History
A été creé
Valen Hung
⟶ mise à jour avec succès 1 déc. 2017 ⟶
List of edits
Les lignes de temps de
Valen Hung
:
8 nov. 2017
0
0
379
Taoyuan Toastmaster Group
Commentaires
Les événements
TAO Chamber Temperature runaway 4h15m
Provide All S/N of Tin Can/Tin Cards and OBOs.
1) Quote was provided by GF for long term protection plan. 2) OBO loopback was swapped for T0 OBO-0 verification under room temp. testing.
6 TiN Card GNET failed on the same period on 21:30 and 22:30, It is new finding we’ve never ever seen it before.
Périodes
1st Run ORT with room temp. and all results positive
2nd & 3rd Run ORT for QSFP PRBS verification. Temp. is not a troubling fact.
4th Run ORT with Thermal + Power cycling profile. OBO and DDR and QSFP are major issue.
Short term protection trail run are good for solution implementation at TAO and iPT both.
5th and 6th Run ORT for T0 OBO-0 hard module verification. Issue cannot duplicated.