33
/fr/
AIzaSyAYiBZKx7MnpbEhh9jyipgxe19OcubqV5w
August 1, 2025
Public Timelines
Menu
Public Timelines
FAQ
Public Timelines
FAQ
For education
For educational institutions
For teachers
For students
Cabinet
For educational institutions
For teachers
For students
Open cabinet
Créer
Close
Create a timeline
Public timelines
Library
FAQ
Éditer
Télécharger
Export
Créer une copie
Premium
Intégrer dans le site Web
Share
S06 ORT History
Category:
Autre
mise à jour avec succès:
1 déc. 2017
0
0
360
Auteurs
Created by
Valen Hung
Attachments
Comments
Taoyuan Toastmaster Group
By
Valen Hung
8 nov. 2017
0
0
446
Les événements
TAO Chamber Temperature runaway 4h15m
Provide All S/N of Tin Can/Tin Cards and OBOs.
1) Quote was provided by GF for long term protection plan. 2) OBO loopback was swapped for T0 OBO-0 verification under room temp. testing.
6 TiN Card GNET failed on the same period on 21:30 and 22:30, It is new finding we’ve never ever seen it before.
Périodes
1st Run ORT with room temp. and all results positive
2nd & 3rd Run ORT for QSFP PRBS verification. Temp. is not a troubling fact.
4th Run ORT with Thermal + Power cycling profile. OBO and DDR and QSFP are major issue.
Short term protection trail run are good for solution implementation at TAO and iPT both.
5th and 6th Run ORT for T0 OBO-0 hard module verification. Issue cannot duplicated.
About & Feedback
Un accord
Confidentialité
Bibliothèque
FAQ
Support 24/7
Cabinet
Get premium
Donate
The service accepts bank transfer (ACH, Wire) or cards (Visa, MasterCard, etc). Processed by Stripe.
Secured with SSL
Comments