33
/es/
AIzaSyB4mHJ5NPEv-XzF7P6NDYXjlkCWaeKw5bc
November 1, 2025
553576
167834
2
Public Timelines
FAQ Obtener premium

Cost Analysis (1 dic 2018 año – 5 dic 2018 año)

Descripción:

-Checking the types of material available
-Selecting the most effective and economical material for the turbine.
-Checking on cost of other accessories required to install the turbine.
-Checking on the installation cost.
Finding means to reduce on the overall cost of the project.

Añadido al timeline:

fecha:

1 dic 2018 año
5 dic 2018 año
~ 4 days