33
/es/
AIzaSyB4mHJ5NPEv-XzF7P6NDYXjlkCWaeKw5bc
November 1, 2025
2764025
490409
2
Public Timelines
FAQ Obtener premium

Johnny Depp - Into The Woods Pre Production: UK (31 agos 2013 año – 8 sept 2013 año)

Descripción:

It is known that Into The Woods was in pre-production and that all the ensemble cast were taken through the staging, rehearsals, costume fittings and singing during August and September 2013.

Sondheim vet Paul Gemignani, who conducted the original show, conducted a 53-piece orchestra at London’s Angel Recording Studios, and then the whole cast — by then thoroughly prepared — recorded their vocals separately. Higham says 93% to 94% of the studio recordings ended up in the film. “We got it bang-on with the (studio) performances. The rest ended up being a live vocal (on the set).”

This took much of August, and Sondheim was present, Marshall says, “to give thoughts and ideas to the actors.”

Añadido al timeline:

hace 4 horas
24
2
191426

fecha:

31 agos 2013 año
8 sept 2013 año
~ 8 days

Fotos: