Baseline 1
Category:
Otro
Actualizado:
2 dic 2019
0
0
418
Autores
Created by
s1pereira
Attachments
Comments
Nobleton EA
By
s1pereira
9 dic 2019
0
0
408
Eventos
Jul 7- Kick off Meeting
Aug 19- Final Submission: Environmental Study report (pre 30 day review)
Dec 13- Hydraulic Modelling Study (W)
Feb 16- System Capacity Optimization study (W)
Nov 24- Final Submission: Hydrogeological Study(HG)
Apr 26- Final Submission: Needs Assessment and Justification Study (WW)
Aug 15- Public Consultation #1
Aug 29- Final Submission: Tech Memo #2
Feb 7- Public Consultation #2
Feb 22- Final Submission: Tech Memo #3
Jul 19- Public Consultation #3
Aug 6- Final Submission: Tech Memo #4
About & Feedback
Acuerdo
Privacidad
Biblioteca
FAQ
Support 24/7
Cabinet
Get premium
Donate
The service accepts bank transfer (ACH, Wire) or cards (Visa, MasterCard, etc). Processed by Stripe.
Secured with SSL
Comments