10 h 45 m, 11 oct 2017 año - Network Setup - Engineer Visit
-----------------------------------------------
Engineers onsite for installation
of Wifi Access Points, Terminating
Network Cables, Installing Patch
Panel, Setup Network Switch and
Router (prep for FTTC), Setup Guest Wifi.
-----------------------------------------------
11 October 2017
Descripción:
Engineers onsite for installation
of Wifi Access Points, Terminating
Network Cables, Installing Patch
Panel, Setup Network Switch and
Router (prep for FTTC).
Añadido al timeline:
fecha:
10 h 45 m, 11 oct 2017 año
Ahora mismo
~ 8 years ago