19 h 12 m, 14 jun 2015 año - Support House With 24ft Header

Descripción:

At this point 3/4 of the crawl is done. That's enough to get the supports in. Poured 3 concrete footings, built a 24ft header, and got a few 20ton jacks. Lifted the house up to remove the weight from the load bearing wall that needs replaced