33
/es/
AIzaSyB4mHJ5NPEv-XzF7P6NDYXjlkCWaeKw5bc
November 30, 2025
2028875
168819
2
Public Timelines
FAQ

2 h 24 m, 1 sept 1844 año -

Descripción:

Work begins in Washington on laying the line to Baltimore using poles. They used chestnut poles of seven meters in height, and 60 meters apart. Two wires were laid, Number 16 copper wire, covered by cotton thread with shellac, and a covering mixture of "beeswax, resin, linseed oil, and asphalt

Añadido al timeline:

30 oct 2018
0
0
220

fecha:

2 h 24 m, 1 sept 1844 año
Ahora mismo
~ 181 years ago