23 ene 2019 año - DAN 7
Descripción:
Detailed Drawings:
A full set of detailed engineering drawings of the prototype to be built
2. The associated bill of materials
3. The cost of materials and delivery estimates (and associated equipment, if any)
4. A timeline outlining the expected fabrication/manufacturing schedule (Gantt chart) with
appropriately detailed activities