IR18429 Drop II SIT Execution (27 ago 2018 ano – 25 set 2018 ano)
Descrição:
Execution includes test of
1) Call Conductor (Trigger Point)
2) API (Connectivity)
3) MICA/RCRM/Assist Edge Robots (Flow to IT)
4) MAXIM/RCRM/MICA/AXIS/FLEXCAB - (Changes in IT systems)
5) UNICOM,ISLFUL,OMFUL,AM-SHARED,BAM,BROADWORKS, NPAMS,IPAMS,CDBOR etc [Used to test order flow to downstreams]
Adicionado na linha do tempo:
Data:
27 ago 2018 ano
25 set 2018 ano
~ 29 days