// todo need optimize like in event.jsp. Add indexing or not indexing this page. Assemble and wire up final prototype (including kit arm, DAQ system, and control interface) (10 h 45 m, 10 abr 2018 ano – 8 h 55 m, 17 abr 2018 ano) (Linha do tempo)
30
/pt/
AIzaSyAYiBZKx7MnpbEhh9jyipgxe19OcubqV5w
April 1, 2024
195570
61868
2

Assemble and wire up final prototype (including kit arm, DAQ system, and control interface) (10 h 45 m, 10 abr 2018 ano – 8 h 55 m, 17 abr 2018 ano)

Adicionado na linha do tempo:

11 fev 2018

Data:

10 h 45 m, 10 abr 2018 ano
8 h 55 m, 17 abr 2018 ano
~ 7 days